The drive is framed in and ready to be poured on Monday! This is the circle drive coming in from the front
..and this is the exit of the circle drive as well as the exit from the car port and courtyard
The porches are almost done. Used a tongue and groove wood for this and stained it black
The balcony railing was installed
..as was the juliet balcony railing
This is the laundry room. The large sink in the back is for washing the dog and the wet suits
This is the mud room bench
...and this WAS my butlers pantry - now turned SCUBA closet...LOL!!
All the cabinet doors have been installed with the exception of the glass front doors which have not come in yet, There will be 4 here...
..and 2 more here.
The library is almost done and ready to be stained.
I picked out granite and marble yesterday which included the surrounds for the fireplaces
These are the shelves for the opposite wall.