More On The Post Tension Foundation..

..okay - so here is the finished product - prior to them pouring the concrete on Wednesday:
All the sections are covered in plastic (don't ask me why) and the cables are laid down in between them going both directions.


 These are the cables that run through all the troughs and will be tightened after the concrete is poured.